For business

Energy
that pays for itself.

We build turnkey solar plants from 50 kW to 1 MW and more: from a small factory to a solar park.

50 kW – 1 MW+
project capacity
45–60 days
container delivery of equipment
30 years
plant warranty

We take on the whole project.

Plant calculator

Size your solar plant.

Enter your consumption and how you use it. We show the plant size, whether you need a battery and how much you save.

Property
When you use most power
House grid (1 or 3 phases)
0kW, recommended plant size

    Get an exact estimate

    By sending the form you agree to the privacy policy.

    How we calculate

    This is an indicative estimate: 1 kW of plant yields about 1100 kWh a year facing south, and a panel needs about 3 m² of roof. An electric car adds about 1000 kWh a month and a heat pump about 4000 kWh a year. For a house, surplus is sold to the grid under net billing (facturare netă): ANRE sets the price monthly from the Romanian market, and we use about 2 lei per kWh. The engineer works out the exact size, equipment, cost and payback from your bills and a site visit.

    Grants

    Grants, loans and cashback for your solar plant.

    ODA grant up to 35%, Microinvest «Green loan» up to 6m lei without collateral, maib and Victoriabank loans. We prepare the grant and bank documents with the project.

    Find financing

    How we work.

    1. 1

      Site visit

      We assess the roof or land, shading, the switchboard and your consumption.

    2. 2

      Design and estimate

      We select the equipment and calculate capacity, cost and payback.

    3. 3

      Permits

      We prepare the design and permits and agree the grid connection.

    4. 4

      Installation and start-up

      Supply from our Chișinău warehouse, installation, commissioning and connection.

    5. 5

      Maintenance

      Plant monitoring and service for its whole life.

    Who trusts us.

    Factories, retail chains, wineries and agricultural companies across Moldova.

    Plants already at work.

    Large sites for industry and retail across Moldova.

    All projects

    BESS

    Energy storage for businesses.

    Industrial BESS cut peak demand and keep operations running during outages.

    More about BESS

    UDG Fire calculator

    How many extinguishers you need.

    Calculated by annex 2 to the general fire safety rules (Government Decision No. 847/2022). Our specialist confirms the exact number and type on site.

    0extinguishers by the norm

      Request selection and a site visit

      By sending the form you agree to the privacy policy.

      How we calculate

      The norm comes from table 1 of annex 2 to Government Decision No. 847/2022: the maximum area protected for the room category and the recommended extinguishers ("++"). Public buildings need 4 powder extinguishers of 5 l per 800 m² and at least 2 on every floor; for production and warehouses the norm depends on the category (200, 400 or 1800 m²). With automatic suppression 50 % of the number is required; the distance to an extinguisher is at most 20 m in public buildings and 30–70 m in production. The room category comes from the project; a UDG Fire specialist confirms the exact number and type on site. GD No. 847/2022, annex 2, annex 2 text.

      Get a commercial proposal.

      Free of charge. An engineer checks your site and consumption and prepares a costed proposal.We call back within an hour during working hours, Mon–Fri 9:00–18:00, Sat 10:00–13:00.

      By sending the form you agree to the privacy policy.

      CallSend a request