For business
Energy
that pays for itself.
We build turnkey solar plants from 50 kW to 1 MW and more: from a small factory to a solar park.
- 50 kW – 1 MW+
- project capacity
- 45–60 days
- container delivery of equipment
- 30 years
- plant warranty
We take on the whole project.

Consulting
We calculate the savings and explain the approvals.

Financing support
We help you choose a bank and secure a loan for the plant.

Direct supply
Equipment in container lots at manufacturer prices.

Service
Monitoring, scheduled maintenance and repairs after start-up.
Plant calculator
Size your solar plant.
Enter your consumption and how you use it. We show the plant size, whether you need a battery and how much you save.
Preliminary estimate
Total
Prices include VAT. Equipment at the prices in our catalogue, work at average rates. The engineer prepares the exact estimate after a site visit.
How we calculate
This is an indicative estimate: 1 kW of plant yields about 1100 kWh a year facing south, and a panel needs about 3 m² of roof. An electric car adds about 1000 kWh a month and a heat pump about 4000 kWh a year. For a house, surplus is sold to the grid under net billing (facturare netă): ANRE sets the price monthly from the Romanian market, and we use about 2 lei per kWh. The engineer works out the exact size, equipment, cost and payback from your bills and a site visit.
Grants
Grants, loans and cashback for your solar plant.
ODA grant up to 35%, Microinvest «Green loan» up to 6m lei without collateral, maib and Victoriabank loans. We prepare the grant and bank documents with the project.
Find financingHow we work.
- 1
Site visit
We assess the roof or land, shading, the switchboard and your consumption.
- 2
Design and estimate
We select the equipment and calculate capacity, cost and payback.
- 3
Permits
We prepare the design and permits and agree the grid connection.
- 4
Installation and start-up
Supply from our Chișinău warehouse, installation, commissioning and connection.
- 5
Maintenance
Plant monitoring and service for its whole life.
Who trusts us.
Factories, retail chains, wineries and agricultural companies across Moldova.


Linella- Kellers Laboratory




Plants already at work.
Large sites for industry and retail across Moldova.
BESS
Energy storage for businesses.
Industrial BESS cut peak demand and keep operations running during outages.
More about BESSUDG Fire calculator
How many extinguishers you need.
Calculated by annex 2 to the general fire safety rules (Government Decision No. 847/2022). Our specialist confirms the exact number and type on site.
How we calculate
The norm comes from table 1 of annex 2 to Government Decision No. 847/2022: the maximum area protected for the room category and the recommended extinguishers ("++"). Public buildings need 4 powder extinguishers of 5 l per 800 m² and at least 2 on every floor; for production and warehouses the norm depends on the category (200, 400 or 1800 m²). With automatic suppression 50 % of the number is required; the distance to an extinguisher is at most 20 m in public buildings and 30–70 m in production. The room category comes from the project; a UDG Fire specialist confirms the exact number and type on site. GD No. 847/2022, annex 2, annex 2 text.
Get a commercial proposal.
Free of charge. An engineer checks your site and consumption and prepares a costed proposal.We call back within an hour during working hours, Mon–Fri 9:00–18:00, Sat 10:00–13:00.