For home
Your own power.
Your own tariff.
A plant on your roof or land that cuts electricity bills and does not depend on grid tariffs. Turnkey design, installation and maintenance.
- 500+
- plants built
- 30 years
- plant warranty
- from 5 kW
- ready-made kits
How a home solar plant works.
Solar panels
Turn sunlight into direct current during the day.
Hybrid inverter
Converts it to standard 230/400 V and decides where the energy goes.
Your home
Runs on solar power first.
Battery
Stores the surplus for the evening and for outages.
Grid
Backs you up when sun and battery are not enough.
Ready-made home solutions.
Every kit is built on a hybrid inverter with a battery from 16 kWh, so the lights stay on even when the grid goes down.
Basic
5 kW
For a smaller home: solar by day, battery in the evening.
- Hybrid inverter 5 kW
- Battery from 16 kWh
- Backup during grid outages
- Recommended
Standard
10 kW
Covers the whole home’s consumption all year round.
- Hybrid inverter 10 kW
- Battery from 16 kWh
- Backup during grid outages
Premium
15 kW
For a large home, a heat pump and EV charging.
- Hybrid inverter 15 kW
- Battery from 16 kWh
- Backup during grid outages
Plant calculator
Size your solar plant.
Enter your consumption and how you use it. We show the plant size, whether you need a battery and how much you save.
Preliminary estimate
Total
Prices include VAT. Equipment at the prices in our catalogue, work at average rates. The engineer prepares the exact estimate after a site visit. You can buy the plant on credit or through a grant programme: grants and loans.
How we calculate
This is an indicative estimate: 1 kW of plant yields about 1100 kWh a year facing south, and a panel needs about 3 m² of roof. An electric car adds about 1000 kWh a month and a heat pump about 4000 kWh a year. For a house, surplus is sold to the grid under net billing (facturare netă): ANRE sets the price monthly from the Romanian market, and we use about 2 lei per kWh. The engineer works out the exact size, equipment, cost and payback from your bills and a site visit.
Grants
Grants, loans and cashback for your solar plant.
Casa Verde up to 50%, GEFF cashback 15–22.5%, a Microinvest loan up to 500,000 lei without collateral. We pick the programme and prepare the application documents with the project.
Find financingWhat the kit includes.
Casa Verde · CNED
The Casa Verde programme.
Casa Verde is the national energy efficiency programme run by CNED. It helps private homes switch to solar: for a plant with a battery, the programme covers half of the project cost.
We handle the technical side: we choose a kit that meets the programme’s rules, prepare the documents for the FEERM platform, install the plant and hand it over for acceptance.
- 50%
- of the plant cost covered by the programme
- up to 200,000 lei
- maximum per home
- until 31.12.2027
- applications open
How we work.
- 1
Site visit
We assess the roof or land, shading, the switchboard and your consumption.
- 2
Design and estimate
We select the equipment and calculate capacity, cost and payback.
- 3
Permits
We prepare the design and permits and agree the grid connection.
- 4
Installation and start-up
Supply from our Chișinău warehouse, installation, commissioning and connection.
- 5
Maintenance
Plant monitoring and service for its whole life.
Support after start-up.

Basic support
For every client: we answer questions Monday to Friday, 9:00 to 18:00.

24/7 support
Under contract we fix faults around the clock and watch the plant through monitoring.

Warranty and service
Warranty and post-warranty service, panel cleaning and repairs.
UDG Fire calculator
How many extinguishers you need.
Calculated by annex 2 to the general fire safety rules (Government Decision No. 847/2022). Our specialist confirms the exact number and type on site.
How we calculate
The norm comes from table 1 of annex 2 to Government Decision No. 847/2022: the maximum area protected for the room category and the recommended extinguishers ("++"). Public buildings need 4 powder extinguishers of 5 l per 800 m² and at least 2 on every floor; for production and warehouses the norm depends on the category (200, 400 or 1800 m²). With automatic suppression 50 % of the number is required; the distance to an extinguisher is at most 20 m in public buildings and 30–70 m in production. The room category comes from the project; a UDG Fire specialist confirms the exact number and type on site. GD No. 847/2022, annex 2, annex 2 text.
See how much you’ll save.
Free. We’ll send a project presentation with a detailed breakdown of your energy costs.We call back within an hour during working hours, Mon–Fri 9:00–18:00, Sat 10:00–13:00.