Grants and support programmes

Grants usually do not pay in advance: the client pays for the plant and the programme reimburses part of the cost after a check. The programme operator decides on the grant. Each programme fits a certain type of client.

A solar plant with ODA «Creștem IMM».

The main state programme for businesses in 2026. Conditions for a solar plant:

  • Own consumption only: capacity sized on the last 12 months of bills, with up to 20% headroom
  • Selling energy to the grid or third parties is not funded by the grant
  • A design, a grid connection permit (aviz de racordare) and 12 months of bills are required
  • Installation and commissioning are covered; VAT, used equipment and loan interest are not
  • The company has operated for at least 2 years, has no tax debts and positive equity
  • Online application in ODA e-Cabinet with an e-signature; the call usually opens on the first working day of the month for 5 working days
  • e-Cabinet shows a budget counter with the value of applications already filed in the current call. Dates and budgets are published in the ODA calendar
  • Since the start of 2026 ODA has approved 410 projects with 195m lei in grants, 66 of them for modernisation and energy efficiency. ODA consultation centre: 022 22 57 99

Overview from open sources as of November 2026. Dates, amounts and document lists change: we check them against the programme before applying. Sources: ODA, Instrument CREȘTEM IMM, ODA, calendar, EU4Moldova, CNED, Casa Verde, GEFF Moldova, Microinvest, Credit verde, AIPA, maib, OTP Bank, Premier Energy Distribution.

We will match a grant or loan to your project.

Tell us what you want to build. An engineer checks which programmes fit and sizes the plant.We call back within an hour during working hours, Mon–Fri 9:00–18:00, Sat 10:00–13:00.

By sending the form you agree to the privacy policy.

CallSend a request